PROJECTS

Use the menu on the right to view each project category
 
 

Project Overview

STELLAR BOARDS_FINAL_Page_1.jpg

This project was originally identified in the Community Revitalization Plan, intended to connect the “two” communities, closing the physical, economic and psychological gap. It will provide a seven-mile bicycle & pedestrian loop throughout Madison and is divided into five phases
• Phase one: Heritage Trail and riverfront development in the 1980’s
• Phase two: Reopening of Hatcher Hill Trail
• Phase three: Connect Hatcher Hill Trail to Michigan Road
• Phase four: Complete the Saddle Tree Segment, connecting Hatcher Hill and        Mulberry Street
• Phase five: Connect Johnson Lake, Madison State Hospital, and Clifty Falls

Project Overview

Saddle Tree Segment

Trail Route Conceptual

Documents

STELLAR BOARDS_FINAL_Page_2.jpg

Project Overview

Rehabilitates four historic properties that influence the image of Downtown Madison for the purposes of housing, these include:
• The Cotton Mill
• The Tower Tack Factory
• The Ohio Theatre
• The Scott Block

Documents

Cotton Mill

Site Plan

Building Rendering

 

Documents

This project enforces the ENVISION Jefferson County Plan of improving the reputation as a destination for tourism and is primarily focused on downtown. This project will:
• Extend the sidewalk along the Riverfront
• Improve and renovate Crystal Beach
• Redevelops an existing playground to be an accessible playground named           

   Playground for All Children on the hilltop
• Create and develop Georgetown Memorial Park
• Develop Heritage Park
• Develop Jaycee Park Restrooms

Project Overview

STELLAR BOARDS_FINAL_Page_3.jpg

Crystal Beach

Crystal Beach Site

Georgetown Memorial Park

Georgetown Memorial Site

 

Documents

Implements two primary gateways, one district gateway and improves the “bridge approach area”. The primary gateways are located at the intersection of SR 62 and US 421 and on SR 56 into downtown. The district gateway for Historic Downtown that is located at the intersection of SR 56 and Harrison Street.

Project Overview

STELLAR BOARDS_FINAL_Page_4.jpg

Bridge Approach Gateway

US 421 Gateway

 

Documents

Focuses on educational initiatives in Downtown Madison and enhances underutilized buildings. Renovates five vacant historic buildings next to River Terrace Health Campus on West Street for:
• A student business, entrepreneurship center, and mentoring program;
• The launch of “Technology Transfer Program” with Hanover College; and
• A nursing education and training facility located on West Street.

Project Overview

STELLAR BOARDS_FINAL_Page_5.jpg
 

Enhances and improves major corridors in Madison (Lanier Drive & Clifty Drive) through:
• Re-envisioning the former Madison Plaza, a vacant property in a prime location
• Implementing sidewalks and improvements along major corridor routes
• Increasing beautification efforts along major corridor routes
• Clifty Drive and Lanier Drive are both in State right-of-way

Project Overview

STELLAR BOARDS_FINAL_Page_6.jpg
 

Documents

Revitalizes the neighborhoods of downtown, Lanier Drive, Green Road, downtown and the Central Business District through:
• Owner-occupied rehabilitation of homes;
• Renovation of facades and 2nd/3rd floors of buildings downtown;
• Improves and implements sidewalk connections;
• Continues to implement Habitat for Humanity housing projects.

Project Overview

STELLAR BOARDS_Page_7.jpg

Revitalizes the neighborhoods of downtown, Lanier Drive, Green Road, downtown and the Central Business District through:
• Owner-occupied rehabilitation of homes;
• Renovation of facades and 2nd/3rd floors of buildings downtown;
• Improves and implements sidewalk connections;
• Continues to implement Habitat for Humanity housing projects.

Owner-occupied rehabilitation of homes
Award Letter

 

Visit

101 W. Main Street

Madison, IN 47250 

Call

Ph: 812-265-8300

Fx: 812-265-3349